FEATURED K-12 PROJECTS
Center for Early Education
Phased construction of a re-configured campus includes a secure and visible new main entrance, new Early Childhood classrooms; a dedicated, full-sized gymnasium to replace the current “multipurpose room” high-tech Lower Elementary classroom, studios and labs; re-configured office, meeting and presentation spaces.
Owner
The CEE Trustees
Architect
Johnson Favor
Location
Los Angeles, CA
General Contractor
Matt Construction
Square Footage
60,000
NGi Scope
-
Preconstruction Consulting
-
Metal Framing
-
Drywall
-
Lath & Plaster
-
Fireproofing
-
Acoustical Ceilings
LAUSD Venice High School
New buildings and various site improvements on the Venice High School campus. New classroom construction will create general classrooms, special education classrooms, two art classrooms, new chemistry labs, a horticultural classroom, attendance office, parent center, auto shop, a graphic design and photo lab print shop, two flexible engineering labs, gymnasium and stadium press box.
Owner
LAUSD
Architect
NAC
Location
Los Angeles, CA
General Contractor
Hensel Phelps
NGi Scope
-
Preconstruction Consulting
-
Design Build
-
BIM Modeling
-
Metal Framing
-
Thermal Insulation
-
Acoustical Insulation
-
Acoustical Panels
Bonita Center of Performing Arts
A 700 seat performing arts theatre through a Lease-Leaseback/Integrated Project Delivery method. The theatre is being designed to serve district theatre performances from local school campuses of all grade levels, as well as professional performances to the San Dimas, Ca. community. The extensive use of Building Information Modeling by NGi and the IPD team has enabled the design, cost and schedule of the project to meet the districts diverse program for this facility.
Owner
Bonita Unified School District
Architect
Rachlin Architects
Location
San Dimas, CA
General Contractor
Tilden-Coil
Square Footage
21,000
NGi Scope
-
Preconstruction Consulting
-
Metal Framing
-
Drywall
-
BIM Modeling