Fireproofing
Our Process
With more than two decades of experience in quality professional fireproofing, NGI has the power to complete the job neatly and efficiently. We can provide multiple skilled crews working simultaneously under seasoned supervision with well-maintained equipment. Fireproofing material application time is minimized while you are assured full-spectrum customer service throughout the process.
A critical step is the fireproofing preconstruction meeting, in which you and Nevell can discuss in-depth arrangements to ensure a smooth, efficient fireproofing construction phase. We’ll talk about and decide such things as placement of equipment, path and placement of the fireproofing delivery hose, anticipated needs for water and electricity, and scheduling of fireproofing construction activities.


NFCA Certified
When it comes to commercial applications, fireproofing is a crucial element that should never be overlooked. Insuring the safety of the building occupants and the property itself is of utmost importance.
As a NFCA certified contractor, Nevell Group's history and track record in Fireproofing has been the first choice for many of the top General Contractors in the industry for over 20 years.
Nevell Group only uses high-quality fireproofing materials and are always equipped with the latest tools and equipment. We work with leading manufacturers to ensure that the materials we use are of the highest standard. Along with our knowledge and expertise, this helps guarantee that the fireproofing solution we provide will withstand the test of time, protect the building and its occupants in case of fire.


Comprehensive Fireproofing Services
Nevell Group offers a wide range of fireproofing services. We provide fireproofing solutions for structural steel, spray-applied fireproofing, intumescent coatings, firestop systems, and more. We also offer a suite of Preconstruction services, constructibility review and consulting.

Fireproofing Project Highlights
Petco Stadium – San Diego, CA
328,000 SF/ $2.8 M- FP

Baseball Park that is home to the San Diego Padres. Located between 7th and 10th Ave, south of J Street. The ball park was constructed by a partnership with Clark Construction, Nielsen Dillingham and Douglas E. Barnhart, Inc. The construction cost of over $450 million was partially funded by the Center City Development Corporation and SD Redevelopment Agency. 35,000 bags SFRM/38,000 Gals IFRM
Palazzo Hotel Casino and Resort – Las Vegas, NV
6,948,980 SF / $21 Million - FP
.jpg)
This is a luxury hotel and casino resort located on the Las Vegas Strip in Paradise, Nevada. It is the tallest completed building in Nevada. The hotel complex is names the largest hotel in the world by the Guinness Book of World Records. 300,000 bags included Low, Medium and High Density type SFRM.
Fontainebleau Resort – Las Vegas, NV
1,400,000 SF / $8.5 M – FP

This tower is a 3,889-room, 68-story resort and casino near the north end of the Las Vegas strip. The building is currently the second tallest in the Las Vegas Valley. 60,000 bags of SFRM
City Creek Reserve - Salt Lake City, UT
1,200,000 SF/ $4.8Million-FP

The City Creek Center is a mixed-use development with an upscale open-air shopping center, office residential buildings, fountain, and simulated creek near Temple Square in downtown Salt Lake City, Utah. Blocks 75 & 76, 50,000 bags of Medium and High density type SFRM.