FEATURED HOSPITAL / OSHPD PROJECTS
Loma Linda University
New Design Assist OSHPD Hospital tower. A massive $1.2-billion, 910,250-square foot rebuilding plan for the Inland Empire medical campus. The renovation was spurred, in part, by seismic requirements that will make the current adult hospital unusable in 2020. The project will consist of a new, three-story diagnostic and treatment center; a total care birthing center; a full mechanical level and two patient bed towers; a ten-story adult patient tower and; a three-story patient tower for the children’s hospital. It will include renovations of existing space along with the construction of brand new facilities NGi’s scope included Scope included; BIM, Cold Formed Metal Framing, Fireproofing, Gypsum Board, and Metal Framing.
Owner
Loma Linda University
​
Architect
NBBJ
​
​
Location
Loma Linda, CA
​
General Contractor
McCarthy Builders
​
Square Footage
910,250
​
NGi Scope
-
Preconstruction Consulting
-
Design Assist
-
Metal Framing
-
Drywall
-
Fireproofing
Kaiser San Diego Medical Center
New seven story 550,000-square-foot multiple building medical center. NGi’s scope for this design assist project included; 16 months of preconstruction that included establishing a target price at 20% DD and to maintain the budget and design through 100% CD drawings, utilizationof BIM, exterior and interior framing, drywall, lath/plaster and fireproofing.
Owner
Kaiser Permanente
​
Architect
OC Architects
​
​
Location
San Diego, CA
​
General Contractor
Hensel Phelps
​
Square Footage
550,000
​
NGi Scope
-
Preconstruction Consulting
-
Design Build
-
BIM Modeling
-
Interior/Exterior Framing
-
Lath & Plaster
Lucille Packard Children's Hospital
New hospital expansion to optimize the hospital’s services and infrastructure, adding more beds, private rooms, state-of-the-art operating suites, family-friendly amenities. The project will relocate utilities and provide approximately 65,000 gsf shell space on Level 5 and approximately 18,000 gsf shell space on Level 1. Level 5 shell buildout will accommodate 2 bed wings totaling 49 patient beds, pharmacy and support spaces. Level 1 shell buildout will accommodate multidisciplinary clinical space.
Owner
Lucille Packard
​
Architect
HGA Architects
​
​
Location
Palo Alto, CA
​
General Contractor
Hensel Phelps
NGi Scope
-
Preconstruction Consulting
-
Design Assist
-
BIM Modeling
-
Metal Framing
-
Drywall
Sharp Chula Vista Medical Center
Ranked one of ENR's Best Regional Projects.170,000-square-foot Design-Build OSHPD hospital, adding 138 private patient rooms, six state-of-the-art operating rooms, and the most advanced health care technology, programs and services to meet the needs of the growing South County region of San Diego.
Owner
Sharp Memorial
​
Architect
Smith Group JJR
​
​
Location
Chula Vista, CA
​
General Contractor
Hensel Phelps
​
Square Footage
170,000
​
NGi Scope
-
Preconstruction Consulting
-
Design Build
-
Metal Framing
-
Drywall
-
Lath & Plaster
-
Fireproofing
Martin Luther King - Inpatient Tower
New construction of three new health care buildings and the reconstruction of five facilities encompassing 285,000 square-feet. The project includes renovation of the Inpatient Tower and construction of a new Multi-service AmbulatoryCare Center building. The project also includes construction of a new 20,000-GSF Ancillary Building housing a cafeteria and administrative support functions. The $165 million OSHPD fast track project includes an emergency department, intensive care units, four operating rooms, 120 patients beds and a birthing facility as well as an upgraded central plant and new emergency generators.